Date:
To:
Project:
From:
(Name)
Return Email:
Company:
Phone:
Location:
Return Fax:
Piping Information:
Nominal Size(s):
Pipe Material:
Pipe Schedule:
Pipe Length(s):
Pipe Liner:
Pipe Insulation:
Insulation Thickness
Maintained Temperature (T
p
):
Available Heating Media
:
;
Temperature
°C ;
Pressure
barg
Heat-Up Requirements* (if any)
Desired Heat-Up Time (t)
(hours)
Initial Temp. (T
i
):
Final Temp. (T
f
):
Minimum Ambient Temperature (T
amin
):
°C (11 m/s wind assumed)
Maximum Ambient Temperature (T
amax
):
°C (assumes no wind)
*
Product Properties
(required for heat-ups only) Specify name of process known
Density (P)
kg/m³;
Viscosity:
Centipoise
Specific Heat (C
p
)
kJ/kg.;
Thermal Conductivity (k):
W/m·°C
Latent Heat of Vaporation (h
v
)
kJ/kg;
Boiling Point
°C
Latent Heat of Fusion (h
r
)
kJ/kg;
Freezing Point
°C
Comments
(Keep comments less than 360 characters.)
Output By Thermon
System Performance
for
mm OD x
mm Wall Tubing Tracer
Tracer Installation (Method of Attachment)
Results for
Tracers:
Min. Temperature Maintained (Tpmin at Tamin Low Ambient):
°C
Max. Temperature Maintained (Tpmax at Tamax High Abmient):
°C
Condensate Rate (per tracer)
Max. Recommended Trapping Distance:
m (Based on Horizontal Tracer)
Max. Recommended Accumulated Vertical Rise
m
Heat-Up Time
h (hours)
Bill of Materials
Qty
Unit Price
Total
1.
2.
3.
4.
5
.
Ship Via
Total:
Thermon . . . The Heat Tracing Specialists®
For the Thermon office nearest you, visit us at
www.thermon.com
.
FORM # 50701AP (2/05)